After nearly 20 years in operation, the 3 layer MSR needed to move to a new UCSD location in the MEG Center in UCSD Qualcomm Institute. The project began in mid-last year with the disassembly.
Reconstruction at the new site followed in the first quarter of 2023. Thanks to the MSR’s modular and durable design, it was successfully rebuilt. The fact that we had the original drawings available online as well as offline certainly contributed to the success.
Many thanks at this point to UCSD and all involved for the good cooperation.